Each course is 12 weeks of short daily lessons that take you from no electrical background to complete, buildable designs. Open a course below — or train in both with the Complete Program.

Underground commercial construction: a padmount switchgear cabinet beside an open trench of conduit

Course · UG

Underground Distribution Design

Go from no electrical background to designing underground power for homes and businesses — sizing transformers, checking voltage drop and flicker, laying out conduit, and drawing construction sketches.

  • 12Weeks
  • 60Lessons
  • 3Built-in apps
  • 2Real projects

Enroll

Six skills employers hire for

  • Size itRead customer drawings, calculate loads, and size transformers and services
  • Route itLay out conduit and trench routes, including 811 and joint trench
  • Equip itPlace switching cabinets and padmount transformers
  • Check itCheck voltage drop and flicker, and run cable pull calculations
  • Build it in 3DBuild complete designs in the 3D Design Simulator
  • Get hiredFinish two portfolio projects and prepare for interviews
Overhead distribution line with pole-mounted transformers along a residential street

Course · OH

Overhead Distribution Design

Go from no electrical background to designing overhead power for homes and businesses — selecting and framing poles, checking sag and clearances, guying, sizing transformers and services, and checking voltage drop and flicker.

  • 12Weeks
  • 60Lessons
  • 4Built-in apps
  • 2Real projects

Enroll

Six skills employers hire for

  • Frame itSelect pole materials, heights and classes, and frame single- and three-phase construction
  • Clear itCheck conductor sag, the ruling span, and NESC clearances
  • Guy itPlace guys and anchors and check pole loading
  • Size itSize pole-mount transformers, banks, services and secondary
  • Check itCheck voltage drop and flicker on overhead services
  • Build it in 3DBuild two complete overhead projects in the 3D Design Simulator

Free sample lesson

Try Day 1 of the Underground course

This is the complete first lesson, exactly as students see it: the reading, the diagram, and the practice questions with answers. No account needed.

Week 1 · Day 1 Lesson 1.1 Underground Distribution Design
Day 1 of 60

What a distribution designer does

Today you'll learn

What an underground distribution designer does all day, how underground differs from overhead, and what a finished design package contains.

Electricity reaches a home in three big steps. Power plants generate it. High-voltage transmission lines carry it long distances to substations. From each substation, distribution lines, called feeders, carry it at medium voltage (typically 4 kV to 35 kV) through neighborhoods and business districts. Near each customer, a transformer steps the voltage down to the 120/240 V or 277/480 V that buildings use.

GENERATION & TRANSMISSIONDISTRIBUTION · what the designer plansUG primary in conduitservice cable1Power plantgenerates2Transmissionhigh voltage, long distance3Substationsteps voltage down4Feeder4–35 kV5Transformerdown to 120/240 V6Customermeter and panel
From power plant to customer · 6 steps

The shaded steps are distribution: the part of the system a designer plans.

A distribution designer plans that last stretch: the feeders, transformers, and service lines that connect customers to the grid. When a developer builds a subdivision, a store, or a hospital, a designer decides:

  • where the power will come from,
  • what route the cable will take,
  • what size cable, conduit, and transformer are needed,
  • what switching and protective equipment goes where, and
  • what the construction crew needs to know to build it safely.

Overhead vs underground. Overhead lines run on poles. They are cheaper to build and easy to inspect and repair, but they are exposed to wind, storms, trees, animals, and cars. Underground (UG) lines run in buried conduit. They cost more to install and take longer to repair, but they are protected from weather, look better, and are required by many cities in new developments. Most new residential and commercial construction in the US is served underground.

UG design has its own challenges:

  • Space. Underground is crowded with water, sewer, gas, and communications lines. You can't just use a taller pole to get past a conflict.
  • Access. Every switch, fuse, and transformer must sit at ground level, where crews can reach it and the public can't.
  • Heat. Buried cable can't shed heat into the air, so it carries less current than the same size overhead wire.
  • Repair time. A failed buried cable has to be located and dug up, so UG systems are designed with backup paths (loops).

The design package. A finished job usually includes:

  1. Load calculations: how much power the customer needs, and proof that the equipment can deliver it within voltage limits.
  2. Construction sketch: a scaled drawing showing every piece of equipment, cable run, conduit, and dimension.
  3. One-line diagram: a simplified electrical picture of the source, switching, transformer, and service.
  4. Materials list: the parts the crew needs.
  5. Notes and approvals: permits, easements, and sign-offs from engineering.

Who you work with. Designers work with customers and developers, project managers, planning engineers (who decide circuit capacity), field inspectors, right-of-way agents, and construction crews. Titles vary by company, but every job involves passing information accurately between these people.

Practice

Try each one first, then check your answer.

  1. List five things a designer hands to a construction crew, or includes in a design package.
    Check my answer
    Any five of: load calculations, construction sketch, one-line diagram, materials list, permits, easements, engineering sign-offs, notes.
  2. Give two reasons underground costs more than overhead, and two reasons customers and cities choose it anyway.
    Check my answer
    Costs: buried conduit costs more to install, and a failed cable takes longer to repair because it has to be located and dug up. Reasons: protected from weather, trees, animals and cars; better appearance; required by many cities.
  3. Why are underground systems built with two sources (loops)?
    Check my answer
    A buried cable failure takes hours to find and repair, so a second source lets crews restore most customers quickly.

Key terms from this lesson

  • Feeder
    The circuit leaving the substation that supplies the distribution system
  • One-line diagram
    A simplified single-line drawing of a circuit from source to load
  • FAQ

    Course questions

    What does a power distribution designer do?

    A power distribution designer plans the overhead and underground facilities that carry electricity from substations to homes and businesses — poles, conductors, transformers, conduit, vaults, and service connections. Designers prepare the drawings, material lists, and work-order packages that line crews build from, while meeting utility standards and safety codes such as the NESC.

    Do I need prior experience or an engineering degree?

    No. The program starts with distribution system fundamentals and builds up to complete design packages. Comfort with basic math and computers is all you need to begin. Experienced line workers, drafters, and engineering technicians use the courses to move into design roles.

    Is the training online and self-paced?

    Yes. Each course is 12 weeks of short daily lessons — about an hour a day, five days a week — but you set the pace. Everything runs in your web browser, and your progress and notes are saved to your account automatically for the full 12 months of your license.

    What do I need to run the 3D simulator?

    A recent desktop, laptop, or iPad with an up-to-date version of Chrome, Edge, Safari, or Firefox (WebGL 2) and an internet connection. No software installation is required. Tablets are the simulator's reference device.

    Should I take the Underground or the Overhead course first?

    Either course stands on its own. Choose the one that matches the work you want to do, or get the Complete Program to train in both — most utilities and contractors value designers who can handle overhead and underground projects.

    Can my company enroll a team?

    Yes, and your company can get a 20% discount by purchasing 10 or more licenses. Your administrator creates an account, then invites employees by email, manages seats, and can see each member's course progress from the organization dashboard. We also build custom training — courses, simulator, and tools tailored to your standards — contact us for pricing.